Skip to content

ABB delivers 1,700 robots for new vehicle production programme

ABB Robotics has supplied more than 1,700 large industrial robots to BMW Group to support the production of its Neue Klasse electric vehicles. These robots, including models IRB 6720, IRB 6740, and IRB 7720 with payloads up to 620kg, are deployed at BMW's plants in Munich and Tiexi for body shop operations such as welding, gluing, riveting, and assembly. The delivery includes the latest OmniCore control platform featuring energy recovery technology and AI integration capabilities, aimed at enhancing efficiency, precision, and sustainability in manufacturing.

Source notes

  1. ABB delivers 1,700 robots for new vehicle production programme↩
Source evidence

Reported by the source; not independently verified.

robots supplied
1,700 robots[3]
payload capacity
≤620[4]
  1. Posted on 17 Nov 2026. Edited by: Jackie Seddon. Read 1069 times. ABB Robotics is supporting the BMW Group in its transformation to electric mobility by supplying over 1,700 large robots for the production of the new “Neue Klasse” generation of vehicles. The powerful industrial robots are used in body shop operations at BMW’s main plant in Munich, Germany, and its plant in Tiexi, China, where the robots will perform
    Exact source
  2. ABB delivers 1,700 robots for new vehicle production programme
    Exact source↩
  3. nly delivering maximum precision and efficiency, but also making a measurable contribution to energy savings and the digitalisation of manufacturing.” The scope of delivery includes the latest ABB Robotics’ IRB 6720 to IRB 6740 and the IRB 7720, optimised for the requirements of car body construction with payloads of up to 620kg. At the main plant in Munich, they are used, among other things, in the production of the
    Exact source↩
  4. demanding and repetitive tasks such as welding, gluing, riveting, and assembly – with the aim of increasing efficiency, precision, and sustainability in production. Joerg Reger, automotive business line manager at ABB Robotics, said: “Our collaboration with the BMW Group underscores a shared vision of flexible and future-proof production. With our powerful robots and innovative OmniCore control platform, we are not o
    Exact source
  5. ntly reduces the start-up phase with its OmniCore control platform and an innovative commissioning system.
    Exact source

Automatically extracted; no manual editorial approval recorded.

Article details
Signal

ABB Robotics delivered over 1,700 large industrial robots (IRB 6720, IRB 6740, and IRB 7720) to BMW Group for the Neue Klasse electric vehicle production programme at plants in Munich and Tiexi, utilizing OmniCore controllers with energy recovery technology.

Timezone · UTC

Article dates follow your selected timezone. Briefing editions use Hong Kong time (UTC+8).