Lead Intelligent Manufacturing's Beijing Facility Begins Mass Production of Humanoid Robots
Overview
Lead Intelligent Manufacturing's Beijing facility has begun mass production of humanoid robots, with a new model 'Tiangong 3.0' being assembled in 15 minutes on an automated line. The factory aims to reach annual capacities of 10,000 units in 2026 and 500,000 units by 2030. Each robot undergoes rigorous testing including software flashing, endurance runs, and safety checks before shipment. The facility supports mixed-model production with quick line changeovers under 15 minutes and integrates closely with nearby R&D centers to accelerate iteration from design to manufacturing.
Generated from attributed reports · Updated 1 hours ago
Event evidence and corrections
0 attributed source owners. Ownership does not establish independent confirmation. Quantities are reported separately and are never added together.
Reported quantity · factory setup time: 2 other · reported trials
“” 汪达舰说,这座超级工厂从今年2月9日启动到4月份首批机器人下线, 仅用2个月攻坚、13天冲刺,便完成产线搭建、调试与装修, 为具身智能产业从技术突破迈向规模化商用注入量产动能。”
Exact source · revision 2Source owner not reported
Reported quantity · line changeover time: 15 other · Basis not reported
“传统工厂里,不同品牌、型号的机器人在同一条产线上生产需要花费大量时间调整;但在这座超级工厂里, 产线换型时间小于15分钟, 可根据市场需求快速复制模块化产线,支持多机型混线生产。”
Exact source · revision 2Source owner not reported
Reported quantity · robot test duration: 8 hours · Basis not reported
““每一台机器人在正式打包前,都会先在工厂里进行8到12小时的整机测试,这过程中要经过三大类200多个项目。”
Exact source · revision 2Source owner not reported
Report timeline
Follow attributed reports and material updates.
- Robotics — Chinese web discoverySignalLead Intelligent Manufacturing's Beijing Facility Begins Mass Production of Humanoid Robots
Lead Intelligent Manufacturing's Beijing facility has begun mass production of humanoid robots, with a new model 'Tiangong 3.0' being assembled in 15 minutes on an automated line. The factory aims to reach annual capacities of 10,000 units in 2026 and 500,000 units by 2030. Each robot undergoes rigorous testing including software flashing, endurance runs, and safety checks before shipment. The facility supports mixed-model production with quick line changeovers under 15 minutes and integrates closely with nearby R&D centers to accelerate iteration from design to manufacturing.
Event coverage history
There is not enough continuous observation data to show a trend.
Timezone · UTC
Article dates follow your selected timezone. Briefing editions use Hong Kong time (UTC+8).