Trustworthy agentic lunar robotics: safety-constrained contingent planning with a foundation-model planner
Overview
This research introduces Asymmetric Knowledge-Level Replanning (AKR) for sustained lunar-base operations, framing robot tasks as safety-constrained contingent planning with irreversible actions and unreliable records.
Generated from attributed reports · Updated 24 minutes ago
Event evidence and corrections
0 attributed source owners. Ownership does not establish independent confirmation. Quantities are reported separately and are never added together.
Control: reported autonomous
“arXiv:2611.30179v1 Announce Type: new Abstract: Sustained lunar-base operations require robots that restore equipment and deliver cargo under conditions unforeseen before deployment. Flown space autonomy executes pre-validated procedures and enters a safe hold outside their scope, whereas foundation models synthesize plans on site that cannot be verified before execution. We formulate these operations as safety-const”
Exact source · revision 1Source owner not reported
Reported quantity · trials: 21000 other · reported trials
“asurements, no irreversible action executes on a false precondition for any planner or record, the sensing cost before an irreversible action is bounded below for every sound knowledge-based policy, and execution with a complete planner ends in a verified goal or a certified hold. AKR executed no hazardous action in 21,000 Monte Carlo trials with sound observations or in 58 full-stack runs; the FF-Replan acting rule”
Exact source · revision 1Source owner not reported
Reported quantity · runs: 58 other · reported trials · Differing source assertions
“asurements, no irreversible action executes on a false precondition for any planner or record, the sensing cost before an irreversible action is bounded below for every sound knowledge-based policy, and execution with a complete planner ends in a verified goal or a certified hold. AKR executed no hazardous action in 21,000 Monte Carlo trials with sound observations or in 58 full-stack runs; the FF-Replan acting rule”
Exact source · revision 1Source owner not reported
Reported quantity · runs: 20 other · reported trials · Differing source assertions
“executed one in 7% of those trials. The median AKR run took 1.10 times the fastest run on the same mission, against 1.50 under the K-replanner acting rule. AKR completed 20 of 21 contingency and sequential-fault runs with an unchanged task model; the original PLEXIL and EUROPA$\rightarrow$PLEXIL procedures completed none.”
Exact source · revision 1Source owner not reported
Reported quantity · runs: 21 other · reported trials · Differing source assertions
“executed one in 7% of those trials. The median AKR run took 1.10 times the fastest run on the same mission, against 1.50 under the K-replanner acting rule. AKR completed 20 of 21 contingency and sequential-fault runs with an unchanged task model; the original PLEXIL and EUROPA$\rightarrow$PLEXIL procedures completed none.”
Exact source · revision 1Source owner not reported
Reported quantity · run_time_ratio: 1.1 other · Basis not reported · Differing source assertions
“executed one in 7% of those trials. The median AKR run took 1.10 times the fastest run on the same mission, against 1.50 under the K-replanner acting rule. AKR completed 20 of 21 contingency and sequential-fault runs with an unchanged task model; the original PLEXIL and EUROPA$\rightarrow$PLEXIL procedures completed none.”
Exact source · revision 1Source owner not reported
Reported quantity · run_time_ratio: 1.5 other · Basis not reported · Differing source assertions
“executed one in 7% of those trials. The median AKR run took 1.10 times the fastest run on the same mission, against 1.50 under the K-replanner acting rule. AKR completed 20 of 21 contingency and sequential-fault runs with an unchanged task model; the original PLEXIL and EUROPA$\rightarrow$PLEXIL procedures completed none.”
Exact source · revision 1Source owner not reported
Report timeline
Follow attributed reports and material updates.
- arXiv Robotics — research abstractsSignalTrustworthy agentic lunar robotics: safety-constrained contingent planning with a foundation-model planner
This research introduces Asymmetric Knowledge-Level Replanning (AKR) for sustained lunar-base operations, framing robot tasks as safety-constrained contingent planning with irreversible actions and unreliable records.